---
title: Schedule Reboots in BrightAuthor
slug: legacy-docs/schedule-reboots-in-brightauthor
docTags: 
createdAt: 2025-03-11T06:58:11.202Z
---

Even though BrightSign players are capable of running for months or even years, scheduling regular player reboots will help maximize trouble-free operation. You can do this in BrightAuthor Classic, as described below.

## Create a Reboot Event

::::WorkflowBlock
:::WorkflowBlockItem
Go to **File > New Presentation** to create a presentation in BrightAuthor. Name the presentation “Reboot”.
:::

:::WorkflowBlockItem
Select your player model and a resolution that that your screen supports.
:::

:::WorkflowBlockItem
Choose the **Full screen** template and switch the playlist to be **Interactive**.
:::

:::WorkflowBlockItem
Click the **other** tab in the **Media Library**.
:::

:::WorkflowBlockItem
Find the **Event Handler** state and drag it into the empty playlist storyboard.
:::

:::WorkflowBlockItem
Double-click the **Event Handler** and switch to the **Advanced** tab.
:::

:::WorkflowBlockItem
Select **Add Command** under **Entry Commands**.
:::

:::WorkflowBlockItem
Set the **Command** to **Other** and the **Command Parameters** to **Reboot**. Select **Ok**.

![](https://api.archbee.com/api/optimize/0prk6SO2dy9LdU77jB8D1/n9jAc0e4KO8YheRqSJ8MX_image.png)
:::
::::

## Schedule the Reboot Event

::::WorkflowBlock
:::WorkflowBlockItem
Save and publish the presentation.
:::

:::WorkflowBlockItem
If the schedule is not completely blue, drag and drop the **Reboot** presentation into the schedule. The **Reboot** presentation should be set as a **non-stop event**.
:::

:::WorkflowBlockItem
Double-click the blue schedule block to open the Schedule Presentation properties.

::Image[]{src="https://api.archbee.com/api/optimize/0prk6SO2dy9LdU77jB8D1/R0cf1PLirl-xg6oQwMJxg_image.png" size="40" width="1280" height="2249" position="center" darkWidth="1280" darkHeight="2249" showCaption="false"}
:::

:::WorkflowBlockItem
Make sure **Active all day, every day** is not selected.
:::

:::WorkflowBlockItem
Set the **Start** and **End** times just 2 to 3 minutes apart. (you can enter a time in the boxes). Don’t schedule a longer time block because the player will reboot multiple times during the block.
:::

:::WorkflowBlockItem
Select the **Recurring Event** box and chose a pattern:

- Select **Daily** for dail&#x79;**,** weekday, or weekend reboots.
- Select **Weekly** to specify specific days of the week.
- Select **No end date** unless you want the scheduled reboots to stop at some point.
:::

:::WorkflowBlockItem
Select **OK**. The schedule appears in the specified time(s). Repeat these steps for any other times you want to reboot the player.
:::

:::WorkflowBlockItem
**Publish** the schedule. If you're not using BrightSign Network, be sure to **Save** the schedule so you can reload it to publish changes later.
:::
::::

:::hint{type="info"}
Advanced users with non-stop schedules can just schedule the Reboot presentation over the existing presentation as a [Schedule Interrupt](docId\:go2VHVit1mkPM8WmRwgIT).
:::

